Authorization for Expenditure files preserved at PNRA from the Fredrickson and Tacoma Public Library collections.

  
  
  
  
  
  
  
  
  
Description
  
  
  
Count= 9811
  
Grand MoundCorrespondTACCorrespond
Handwritten letter from M.L. Boyer (manufacturer of Fir Lumber) & maps
Sub17/1801-10-03-34B
  
BakerRiprap TAC011907-012321907-0148AFE
Protection for bridge 146, Canceled
Sub1-G01-06-02-12A
  
BakerExtd P trackTAC011913-006241913-0061AFE
652' extension to the passing track
Sub1-G01-06-02-12A
  
BakerRiprapTAC011917-029851917-0133AFE
Protection for bridge 28
Sub1-G01-06-02-12A
  
BakerBridgeTAC011919-004051919-0014AFE
Reinforce floor beams on bridge 30
Sub1-G01-06-02-12A
  
BaldiGradingTac011933-0234AAFE
Riprap bank protection near bridge #72
Sub-1-102-09-03-12B
  
BaldiRemodelTAC011918-S-2811918-0246AFE
"Double" signal maintainers house
Sub1-K01-06-02-34B
  
BaldiCmrl spurTAC011920-009251920-0017AFE
Create internal run around track within Green River Lbr's spur line
Sub1-K01-06-02-34B
  
BaldiRelay railTAC011925-017411925-0025AFE
Replace 1152' of 56# rail with 90#
Sub1-K01-06-02-34B
  
BirdAdd trackTAC011937-00120AFE
Relay curve #86
Sub-1-102-09-03-12B
  
BorupPassing trackTAC011901-000801901-0031AFE
3,300' passing track
Sub1-I01-06-02-56A
  
BorupExtd p trackTAC011906-000801906-0048AFE
483' extension to passing track. Interesting file including discussion of "green Italians"
Sub1-I01-06-02-56A
  
BorupSection houseTAC011906-003161906-0045AFE
(Comfortable) section house to replace bunk car and keep crews happy
Sub1-I01-06-02-56A
  
BorupCulvertTAC011913-025241913-0147AFE
Cast iron pipe (CIP) culvert to replace bridge
Sub1-I01-06-02-56A
  
BorupSnow fenceTAC011916-028951916-0099AFE
1000' of open board snow fence where drifts are constant
Sub1-I01-06-02-56A
  
BorupStandpipeTAC011916-030641916-0149AFE
Additonal water standpipe to service westbound track
Sub1-I01-06-02-56A
  
BorupRemove depotTAC011917-027191917-0118AFE
Remove old depot as double track to Stampede is now in place
Sub1-I01-06-02-56A
  
BorupCulvertTAC011918-005841918-0047AFE
Repairing wing wall of culvert to avoid a washout
Sub1-I01-06-02-56A
  
Borup - LemoloHazard alertTAC011927-017491927-0165AFE
Rock slide detector fencing
Gen1-B01-05-04-56A
  
Borup - WestonRelay railTAC011904-01206AFE
Replace 72# with 85#
Gen1-B01-05-04-56A
  
Borup - WestonPassing trackTAC011906-003001906-0053AFE
3,300' long
Gen1-B01-05-04-56A
  
BristolPassing trackTAC011905-0097AFE
3148' passing track
Sub1-F01-06-01-56B
  
BristolDepotTAC011906-003051906-0053AFE
4th class combined depot - $788.19
Sub1-F01-06-01-56B
  
BristolTemp spurTAC011908-011441908-0056AFE
300' of temporary spur to service J.T. Taylor - CANCELED
Sub1-F01-06-01-56B
  
BristolExtd P trackTAC011912-007181912-0074AFE
832' extention to W bound passing track
Sub1-F01-06-01-56B
  
BristolExtd P trackTAC011912-007191912-0056AFE
1119' extention to E bound passing track
Sub1-F01-06-01-56B
  
BristolRelocate team trackTAC011913-003501913-0047AFE
Relocate team track to the north side of the main line
Sub1-F01-06-01-56B
  
BristolCmrl spurTAC011913-007241913-0089AFE
468' extension to team track to service Cascade Lumber
Sub1-F01-06-01-56B
  
BristolCulvertTAC011916-024401916-0092AFE
Install 24" concrete culvert
Sub1-F01-06-01-56B
  
BristolWater tankTAC011917-007751917-0056AFE
Remove decayed water tank / transport water from Dudley
Sub1-F01-06-01-56B
  
BristolGas store tankTAC011919-000441919-0115AFE
100 gallon gasoline storage tank for section gang's motor car
Sub1-F01-06-01-56B
  
Bristol - BakerRail anchorsTAC011915-024161915-0168AFE
Gen1-A01-05-03-56B
  
Bristol - Palmer JctRelay railTAC011928-001361927-0195AFE
Gen1-A01-05-03-56B
  
Bristol, Easton & HumphreyMotor carsTAC011923-009701923-0050AFE
For section gang use at each location
Gen1-A01-05-03-56B
  
Bristol, Easton & HumphreyGas tanksTAC011923-01133AFE
100 gal units for each location
Gen1-A01-05-03-56B
  
BrydExtd P trackTAC011912-023211912-0087AFE
696' extension to the passing track
Sub1-L01-06-02-56B
  
BrydRaise P trackTAC011923-009051923-0047AFE
Raise level of 3,625' passing track 14" to par with main line using lester cinders
Sub1-L01-06-02-56B
  
BrydCmrl spurTAC011924-002701924-0001AFE
Spur for Lake Sawyer Lbr
Sub1-L01-06-02-56B
  
Bryd - AuburnRelay railTAC011927-001131926-0175AFE
Upgrade material used at curved sections to 100#
Gen1-B01-05-04-56A
  
Bryd - AuburnBallastingTAC011927-002531927-0010AFE
Gen1-B01-05-04-56A
  
Bryd - AuburnRelay railTAC011928-000331927-0192AFE
Upgrade material used at curved sections to 100# & 130# stock
Gen1-B01-05-04-56A
  
ByrdPassing trackTAC011907-005941907-0040AFE
3,300' passing track
Sub1-L01-06-02-56B
  
ByrdAdd trackTac011940-00774AFE
Relay passing tracks, here and Ravensdale
Sub-1-102-09-03-12B
  
Cabin CreekCorrespondenceTAC011907-1956Correspond
leases for spur track and crossings for Cascade Lumber Co.
Sub-1-102-09-03-12B
  
Cabin CreekShelter/shedTAC011921-010361921-0070AFE
8' x 14' Shelter/shed for Cabin Creek Lumber mill spur
Sub1-H01-06-02-34A
  
Cabin CreekDerailTAC011921-010371921-0038AFE
Install derail to protect main line from stray cars x Cabin Creek mill
Sub1-H01-06-02-34A
  
Casway - Cle ElumRelay railTAC011920-00688AFE
Replace 85# or Bessemer with 90# OPEN HEARTH
Gen1-A01-05-03-56B
  
TeanawayRemove trackTac011947-00114AFE
Remove the 4031' westbound passing track
Sub-1-102-09-03-12B
  
Cle Elum - EastonEquipmentTAC011914-00292AFE
ABS installation
Gen1-B01-05-04-56A
  
Cle Elum - LesterTelegraph TAC011914-00794AFE
Reconstruct pole lines
Gen1-B01-05-04-56A
  
Cle Elum - NelsonPassing trackTAC011906-000711906-0029AFE
3327' between Cle Elum and Nelson (Baker)
Gen1-B01-05-04-56A
  
Cle Elum CommercialExtd spurTAC011903-019101903-0000AFE
150' extension to Summit Coal Mine spur
Sub1-G01-06-02-12A
  
Cle Elum CommercialCmrl spurTAC011905-005301905-0103AFE
540' spur to serve Summit adjacent to NWI spur, later ('20) used by Independent
Sub1-G01-06-02-12A
  
Cle Elum CommercialCmrl spurTAC011913-027471913-0178AFE
Request for spur to serve Cascade Lbr, canceled after authorization
Sub1-G01-06-02-12A
  
Cle Elum CommercialRearrange spurTAC011914-023551914-0131AFE
Moving track to away from slide prone slope at Summit mine
Sub1-G01-06-02-12A
  
Cle Elum CommercialCmrl spurTAC011915-006981915-0093AFE
683' spur line for Standard Oil, 123' of which to be owned and maintaine by customer
Sub1-G01-06-02-12A
  
Cle Elum CommercialExtd spurTAC011916-024841916-0109AFE
592' of new track for 2 leads to service operation to be opened by Independent Coal and Coke
Sub1-G01-06-02-12A
  
Cle Elum CommercialValuation recordTAC011917-027211917-0120AFE
Create record of improvements previously made but not documented
Sub1-G01-06-02-12A
  
Cle Elum CommercialRemove spurTAC011917-028871917-0128AFE
Remove Cle Elum Coal'ssiding "B"
Sub1-G01-06-02-12A
  
Cle Elum CommercialCmrl spurTAC011923-014671923-0091AFE
123' new spur to service Union Oil. (New cut in Std Oil spur)
Sub1-G01-06-02-12A
  
Cle Elum CommercialRemove trackTAC011927-014701927-0124AFE
Remove 346' off the end of a former log dump spur for Miller Lumber
Sub1-G01-06-02-12A
  
Cle Elum CommercialRemove trackTAC011928-013231928-0000AFE
4572' of track removed representing spurs for the Independent Mine and Summit mine operations
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Reloc depotTAC011906-004491906-1&2AFE
Major rearrangement of terminal facilities, intake of property via vacation, plus track extension/revision work
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities Extd P trackTAC011906-001421906-0084AFE
Split of RFA's 1&2 - 2767'+ extension of passing track at west end of yard, includes crossover to coal dock track
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities ScaleTAC011906-011231906-0091AFE
Swap out worn out unit, move 80 ton scale into its place, then install new 125 ton unit in its place
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities X-ing alarmTAC011912-007231912-0128AFE
Crossing alarm using Hoeschen locomotive type bell
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities Gravel pit trackTAC011912-014541912-0132AFE
Relocate gravel pit track and setup to work new pit - includes correspondence in 1920
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities Coal bunker trackTAC011912-024261912-0212AFE
Relocate track to commence use of new bunkers / NW Improvement Co. involvement
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities Remove trackTAC011913-002191913-0031AFE
Remove 520' of old coal bunker track that was obsolete
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities Extd P trackTAC011913-006261913-0072AFE
372' extention to W bound passing track
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities Relay railTAC011913-012761913-0082AFE
Replace 56# stock with 85# on west leg of wye
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities Rearrange trackTAC011913-014121913-0167AFE
"Throw" 7 yard tracks to provide proper clearance of 13' centers
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities Tell talesTAC011914-003941914-0039AFE
Placement of 3 double track and 1single track tell tales for approaches to coal dock
Sub1-F01-06-01-56B
  
Cle Elum Depot & Facilities BuildingTAC011914-027811914-0158AFE
Replace freight house after fire, consider moving scale from Ronald
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Wheel trackTAC011915-013131915-0162AFE
60' wheel track
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Water tankTAC011916-024211916-0079AFE
Replace decayed low tank with 48K gal.high tank for better pressure
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Extd stock yardTAC011916-024371916-0095AFE
7480 sq' addition to the sock yard to hold more sheep
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Double toiletTAC011917-002831917-0011AFE
Improved capacity for labor force
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Extd cinder pitTAC011918-024681918-0110AFE
60' extention to cinder pit
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Scale deckTAC011917-033551917-0170AFE
Replace wooden deck on track scale with one of steel
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities ScaleTAC011918-000261918-0004AFE
Scale for LCL freight
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Tie platesTAC011921-006691921-0027AFE
Replace tie plates not afforded under previous AFE - 959 of 19'20
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities ScaleTAC011921-009881921-0044AFE
Anchoring the deck on the track scales so as to assure accurate readings
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities FenceTAC011922-018751922-0157AFE
install woven wire fence along Railroad Ave. to comply with '06 agreement
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Coal plantTAC011921-012101921-0057AFE
Take over ownership and operation of NW Improvement Co. coal handling plant
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities RemodelTAC011923-003181923-0031AFE
Extend the freight house platform by 100'
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Coal craneTAC011925-012221925-0000AFE
Enlarge cab of traveling coal crane and modify wiring
Sub1-G01-06-02-12A
  
Cle Elum Depot & Facilities Engine tracksTAC011927-017701927-0164AFE
Rearrange engine tracks, removing switch and extra work
Sub1-G01-06-02-12A
  
CovingtonCmrl spurTAC011901-004281901-0109AFE
200' spur off house track to service Soos Ceek Lbr Co.
Sub1-M01-06-03-12A
  
CovingtonExtd spurTAC011903-018301903-0328AFE
60' extension to Covington Lbr Co. spur
Sub1-M01-06-03-12A
  
CovingtonExtd P trackTAC011912-020141912-0061AFE
999' extension to W bound passing track
Sub1-M01-06-03-12A
  
CovingtonExtd P trackTAC011913-000901913-0011AFE
975' extension to E bound passing track
Sub1-M01-06-03-12A
  
CovingtonFreight shedTAC011914-005151914-0044AFE
12' x 10' freight shelter shed - hand written note by agent Schmider
Sub1-M01-06-03-12A
  
CovingtonCmrl spurTAC011916-027461916-0111AFE
385' spur for H N Burpee
Sub1-M01-06-03-12A
  
CovingtonRemove spurTAC011916-030041916-0150AFE
Remove Covington Lbr Co. spur
Sub1-M01-06-03-12A
  
CovingtonCmrl spurTAC011918-001591918-0006AFE
Request for spur to service C.W.Nessly - canceled
Sub1-M01-06-03-12A
  
CovingtonCmrl spurTAC011919-028401918-0102AFE
700' spur to serve Western Washington Land & Irrigation
Sub1-M01-06-03-12A
  
CovingtonGas tankTAC011923-002911923-0030AFE
Gas tank to service motor car
Sub1-M01-06-03-12A
  
CovingtonCmrl spurTAC011923-013791923-0082AFE
600' spur off WWL&I spur for Evergreen Valley Lbr Co.
Sub1-M01-06-03-12A
  
CovingtonCmrl spurTAC011923-016851923-0122AFE
664' spur for Ralph Hawley - canceled
Sub1-M01-06-03-12A
  
CovingtonTrain order signalTAC011925-006391925-0057AFE
New train order signal
Sub1-M01-06-03-12A
  
CovingtonWig wagTAC011926-007031926-0023AFE
Wig wag signal and crossing sign
Sub1-M01-06-03-12A
  
CovingtonElectric lightsTAC011926-018151926-0174AFE
Install electric service to depot and section house
Sub1-M01-06-03-12A
  
DudleyChannelTAC011904-002981904-0059AFE
Excavate and provide support for canal under the tracks
Sub1-F01-06-01-56B
  
DudleyPassing trackTAC011907-004471907-0049AFE
3798' passing track
Sub1-F01-06-01-56B
  
DudleyExtd P trackTAC011912-007291912-0066AFE
Extend E bound track 1177' / W bound by 1146' to handle 70-75 car consists
Sub1-F01-06-01-56B
  
DudleyPumpTAC011916-030961916-0164AFE
Replace steam pump with gas engine pump
Sub1-F01-06-01-56B
  
DudleyCmrl spurTAC011930-005081930-0030AFE
252' interchange track with Cascade Lumber's tracks
Sub1-F01-06-01-56B
  
Dudley - BristolBank wideningTAC011915-011281915-0059AFE
Gen1-A01-05-03-56B
  
Dudley - BristolballastingTAC011915-011751915-0056AFE
Gen1-A01-05-03-56B
  
Dudley - KountzLine changeTAC011932-000291932-0100AFE
Throw track
Gen1-A01-05-03-56B
  
Dudley - Palmer JctRelay railTAC011925-07007AFE
Gen1-A01-05-03-56B
  
Eagle GorgeCorrespondTAC01Correspond
concerning Eagle Gorge
Sub1-K01-06-02-34B
  
Eagle GorgeCmrl spurTAC011901-006791901-0152AFE
173' spur for Page Lbr
Sub1-K01-06-02-34B
  
Eagle GorgeCmrl spurTAC011906-004721906-0104AFE
4068' spur for Gale Creek Lbr
Sub1-K01-06-02-34B
  
Eagle GorgeExtd P trackTAC011910-002711910-0033AFE
150' extension to W bound passing track
Sub1-K01-06-02-34B
  
Eagle GorgeTrackTAC011910-004261910-0035AFE
900' of track for Lucas Lbr (track only)
Sub1-K01-06-02-34B
  
Eagle GorgeTrackTAC011910-020031910-0109AFE
561' of track for Lucas Lbr (track only)
Sub1-K01-06-02-34B
  
Eagle GorgeAuto signalTAC011912-020571912-0155AFE
Auto block signal at Lucas Lumber spur
Sub1-K01-06-02-34B
  
Eagle GorgeSet out trackTAC011913-001031913-0021AFE
Create 700' set out track and extend W bound ps track 154'
Sub1-K01-06-02-34B
  
Eagle GorgeSpecial toiletTAC011913-014171913-0161AFE
Sanitary toilet flushing to a wooden vault installed to protect the Tacoma water supply
Sub1-K01-06-02-34B
  
Eagle GorgeMove P trackTAC011914-006551914-0077AFE
Relax curvature of west turn out of W bound passing track
Sub1-K01-06-02-34B
  
Eagle GorgeCulvertTAC011914-005651914-0082AFE
Replace wood box culvert with 36" concrete pipe
Sub1-K01-06-02-34B
  
Eagle GorgeWater supplyTAC011914-010641914-0030AFE
Connect water tank with station
Sub1-K01-06-02-34B
  
Eagle GorgeBridge walkwayTAC011914-011951914-0103AFE
Walk and hand railing for both sides of the Green River bridge
Sub1-K01-06-02-34B
  
Eagle GorgeRearrange trackTAC011915-021871915-0151AFE
Rearrange track to provide for a 780' interchange track for Page Lbr
Sub1-K01-06-02-34B
  
Eagle GorgeRelay railTAC011916-011571916-0104AFE
Replace 256' of 56 & 60# stock of W bound siding with 85#
Sub1-K01-06-02-34B
  
Eagle GorgeCmrl spurTAC011917-028061917-0122AFE
A second long spur line for Page Lbr
Sub1-K01-06-02-34B
  
Eagle GorgeBridgeTAC011919-004031919-0027AFE
Reinforce floor beams of bridge #75
Sub1-K01-06-02-34B
  
Eagle GorgeBridgeTAC011919-004041919-0029AFE
Reinforce floor beams of bridge #74
Sub1-K01-06-02-34B
  
Eagle GorgeRelocate switchTAC011919-024161919-0078AFE
Move switch 99' E, away from depot for safety
Sub1-K01-06-02-34B
  
Eagle GorgeRemove spurTAC011919-024841919-0099AFE
Remove Sandberg spur, originally installed for Lucas - 1311'
Sub1-K01-06-02-34B
  
Eagle GorgeSpecial toiletTAC011921-012211921-0057AFE
Construct new toilet building to include concrete vault
Sub1-K01-06-02-34B
  
Eagle GorgeExtd depotTAC011922-008511922-0015AFE
20' x 16' extension to depot to provide for a womens waiting room
Sub1-K01-06-02-34B
  
Eagle GorgeEquipmentTac011944-00549AFE
Spring switch and facing point lock
Sub-1-102-09-03-12B
  
Eagle gorge - LemloTunnelTAC011929-015071929-0134AFE
Increase clearance on tunnel #7
Gen1-B01-05-04-56A
  
Eagle Gorge - Palmer JctWheel lube deviceTAC011927-003701927-0004AFE
Derrick Flange Oiler
Gen1-B01-05-04-56A
  
East AuburnBridge TAC011905-00136AFE
150' P.S. through span section for bridge 23
Gen1-B01-05-04-56A
  
East AuburnFlood dykeTAC011903-018621903-0342AFE
100' long dyke / cooperative effort between RR, King County and residents
Sub1-M01-06-03-12A
  
East AuburnQuarry spurTAC011907-004431907-0045AFE
2,000' extension to gravel pit track
Sub1-M01-06-03-12A
  
East AuburnRun around trackTAC011907-004921907-0079AFE
1,550' run around track for gavel pit spur
Sub1-M01-06-03-12A
  
East AuburnCmrl spurTAC011913-007151913-0051AFE
1202' extra spur off gravel pit spur to quarry gravel for King County
Sub1-M01-06-03-12A
  
East AuburnTrack accountTAC011914-013901914-0112AFE
Gravel operation, how to account for
Sub1-M01-06-03-12A
  
East AuburnRearrange trackTAC011914-024061914-0099AFE
Throw and extend King County gravel spur
Sub1-M01-06-03-12A
  
East AuburnPedestrian walkTAC011915-006501915-0061AFE
Pile bridge and sidewalk undercrossing for Main St
Sub1-M01-06-03-12A
  
East AuburnX - ing signTAC011915-012851915-0099AFE
Crossing sign at First St.
Sub1-M01-06-03-12A
  
East AuburnRiprapTAC011915-022121915-0135AFE
for bridge 4
Sub1-M01-06-03-12A
  
East AuburnBridge TAC011917-025271917-0049AFE
Remove two 155' steel beams and replace with trestle crossing former channel of the White River
Sub1-M01-06-03-12A
  
East AuburnBridge walkwayTAC011918-004281918-0032AFE
Walk and railing along bridge for safety of trainmen during switching operations
Sub1-M01-06-03-12A
  
East AuburnConcrete plantTAC011918-010181918-ED20AFE
Additional facilities at at Auburn Concrete Plant (Company business?)
Sub1-M01-06-03-12A
  
East AuburnRelay railTAC011921-006721921-ED36AFE
Replace 85# with 90# 1.42 miles leading into the wye including 6 turnouts
Sub1-M01-06-03-12A
  
East AuburnRelay railTAC011921-006731921-ED37AFE
Replace 85# with 90# on both legs of the wye
Sub1-M01-06-03-12A
  
East AuburnGas tankTAC011923-002911923-0030AFE
Gas tank to service motor car FIND FILE under Covington
Sub1-M01-06-03-12A
  
East AuburnSwitchTAC011927-017271927-0159AFE
Spring switch to convert stub track to second track of Tacoma leg of the wye
Sub1-M01-06-03-12A
  
East AuburnAbandon waterTAC011929-0464A1929-0034AFE
Abandon 3+ mile long gravity feed wooden water supply line from Little Soos Creek
Sub1-M01-06-03-12A
  
East AuburnGradingTac011951-0810BAFE
Culvert
Sub-1-102-09-03-12B
  
East AuburnGradingTac011952-000911952-ED14AFE
Concrete plank crossing
Sub-1-102-09-03-12B
  
EastonCmrl spurTAC011907-005341907-0070AFE
525' spur for F C Wescott's log loading needs
Sub1-H01-06-02-34A
  
EastonCmrl spurTAC011909-001141909-0018AFE
2000' spur for Cascade Lbr between the main line and Yakima River
Sub1-H01-06-02-34A
  
EastonCmrl spurTAC011911-002321911-0021AFE
530' addition to Cascade Lbr spur (see AFE 1691 of '20 for file)
Sub1-H01-06-02-34A
  
EastonCmrl spurTAC011913-003931914-0042AFE
700' spur for use by the U.S. Reclaimation Service
Sub1-H01-06-02-34A
  
EastonLand saleTAC011916-003761916-0093AFE
Sale of land to Johnson Brothers and Sarah Bower
Sub1-H01-06-02-34A
  
EastonExtd spurTAC011916-029551916-0130AFE
222' extension to the "government spur" now to serve the interests of Pettijohn and Craig ( timber ) File states the spur was removed under AFE # 224 of 1929
Sub1-H01-06-02-34A
  
EastonExtd spurTAC011917-025551917-0110AFE
Rearrange wye tail and extend Wescott spur 75'
Sub1-H01-06-02-34A
  
EastonExtd spurTAC011919-024531919-0083AFE
60' extension to oil spur line to accommodate Cascade Lbr (they pay costs)
Sub1-H01-06-02-34A
  
EastonRemove spurTAC011920-016911920-0057AFE
Remove spur for Cacade Lbr except 300' to be left for cinder disposal
Sub1-H01-06-02-34A
  
EastonRemove trackTac011940-004711940-0067AFE
Remove 546'+ coal track FIND FILE UNDER LESTER
Sub-1-102-09-03-12B
  
EastonRemove trackTAC011946-007961946-0190AFE
remove Engine terminal tracks
Sub-1-102-09-03-12B
  
Easton - BorupTelegraph TAC011915-00615AFE
Reconstruction of joint NP / Western Union pole lines
Gen1-B01-05-04-56A
  
Easton - LesterEquipmentTAC011917-02804AFE
ABS installation
Gen1-B01-05-04-56A
  
Easton - UphamRiprapTAC011913-025271913-0126AFE
at bridge 161
Gen1-B01-05-04-56A
  
Easton Depot areaWater supplyTAC011908-002521908-0051AFE
Gravity water supply x Cabin Creek
Sub1-G01-06-02-12A
  
Easton Depot areaExpand depotTAC011911-006511911-0077AFE
17' extension and rearrangement of depot
Sub1-G01-06-02-12A
  
Easton Depot areaPlatformTAC011914-026461914-0170AFE
300' platform between main line tracks
Sub1-G01-06-02-12A
  
Easton Depot areaHotelTAC011918-021911918-0077AFE
Rearrange section house to provide "hotel" facilities for crews after fire levels commercial hotel
Sub1-G01-06-02-12A
  
Easton Depot areaRemodelTAC011919-023851919-0074AFE
12' x10' "lean to" addition to agent family's car body residence. Will be used as a kitchen.
Sub1-G01-06-02-12A
  
Easton Depot areaWater supplyTAC011919-026971919-0100AFE
Improving water supply and attaching a 50' fire hose to protect hotel
Sub1-G01-06-02-12A
  
Easton Depot areaElectric lightsTAC011929-008151929-0001AFE
Install electric lights in various buildings
Sub1-G01-06-02-12A
  
Easton RoundhouseExtd P trackTAC011906-002671906-0038AFE
2320' extension to the W bound passing track including a crossover
Sub1-G01-06-02-12A
  
Easton RoundhouseConnection TAC011909-006401909-0112AFE
486' track connecting to the C.M.StP. & P. RR
Sub1-G01-06-02-12A
  
Easton RoundhouseEngine trackTAC011911-020371911-0109AFE
Rearrange track at the engine facilities
Sub1-G01-06-02-12A
  
Easton RoundhouseExtd P trackTAC011912-007221912-0054AFE
1010' extension of E bound passing track
Sub1-G01-06-02-12A
  
Easton RoundhouseOil stationTAC011912-022111912-0134AFE
Auburn to Easton - helper engine fuel oil station. Similar stations in Auburn & Lester
Sub1-G01-06-02-12A
  
Easton RoundhouseOil station trackTAC011912-020831912-0137AFE
390' track to access the fuel station
Sub1-G01-06-02-12A
  
Easton RoundhouseSewer hookupTAC011912-006631912-0019AFE
Water and sewer service for roundhouse and machine shop
Sub1-G01-06-02-12A
  
Easton RoundhouseShedTAC011913-004361913-0172AFE
Structure to cover the turntable
Sub1-G01-06-02-12A
  
Easton RoundhouseExtd stock yardTAC011913-013591913-0143AFE
52' x 32' expansion of stock yard
Sub1-G01-06-02-12A
  
Easton RoundhouseRemodelTAC011913-023271913-0145AFE
Repair roundhouse that was damaged by July 7th fire leveling town
Sub1-G01-06-02-12A
  
Easton RoundhouseRelay crossoverTAC011914-010361914-0028AFE
Sub1-G01-06-02-12A
  
Easton RoundhouseRelay P trackTAC011914-014311914-0173AFE
Relay former passing track now 2nd main with 90#
Sub1-G01-06-02-12A
  
Easton RoundhouseOil seperatorTAC011914-024001914-0133AFE
Install oil seperator to quell the concerns of farmers
Sub1-G01-06-02-12A
  
Easton RoundhouseElect TT motorTAC011915-023311915-0159AFE
Install turntable tractor to save cost of human actuation
Sub1-G01-06-02-12A
  
Easton RoundhouseRemodelTAC011917-032231917-0164AFE
Install support bracing for turntable shed's roof
Sub1-G01-06-02-12A
  
Easton RoundhouseRemodelTAC011921-001631921-0021AFE
Install shutters on northside windows to prevent breakage during operation of rotary snow plow
Sub1-H01-06-02-34A
  
EllensburgAdd trackTac011945-00130AFE
Move the depot spur eastward to create a longer track
Sub-1-102-09-03-12B
  
EllensburgAdd trackTac011934-00440AFE
60' extension to the California Packing Co. spur
Sub-1-102-09-03-12B
  
EllensburgRemove trackTac011934-00395AFE
Remove coal dock and 530' of track
Sub-1-102-09-03-12B
  
EllensburgAdd trackTac011946-006801946-0163AFE
New track to connect to the back side of the old engine house and machine shop now leased by the Chas. H. Lilly Co.
Sub-1-102-09-03-12B
  
Ellensburg - CaswayRelay railTAC011919-01005AFE
with 90#.
Gen1-A01-05-03-56B
  
Ellensburg - Cle ElumRelay railTAC011913-012381913-0088AFE
Gen1-A01-05-03-56B
  
Ellensburg - Cle ElumRelay railTAC011913-014291913-0177AFE
with 85#
Gen1-A01-05-03-56B
  
Ellensburg - Cle ElumRail anchorsTAC011918-001641918-0009AFE
Replacement
Gen1-A01-05-03-56B
  
Ellensburg - Easton + Lester - HumpRail anchorsTAC011916-020041916-0064AFE
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctTie platesTAC011914-003101914-0034AFE
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctCulvertTAC011914-020131914-0081AFE
Repair work
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctRelay railTAC011912-01433AFE
with 85#
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctTie platesTAC011916-021971916-0141AFE
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctBridge & CulvertTAC011917-00711AFE
Bridge, trestle & culvert work
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctTie platesTAC011917-024451916-0206AFE
Replaced Wollhaupter & Glyndon type with standard plates
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctCulvertTAC011918-02464AFE
Wood box replacement with concrete pipe
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctTie platesTAC011921-00521AFE
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctTie platesTAC011923-01007AFE
Removal of Goldie type
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctTie platesTAC011923-01336AFE
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctTie platesTAC011928-00369AFE
Gen1-A01-05-03-56B
  
Ellensburg - Palmer JctMOW workTAC011928-00874AFE
Intensive seasonal
Gen1-A01-05-03-56B
  
Ellensburg - TacomaPhone lineTAC011909-00395AFE
Twisted pair phone cable replacement
Gen1-A01-05-03-56B
  
Ellensburg DepotCorrespondTAC01Correspond
General history, newspaper clippings
Sub1-D01-06-01-12B
  
Ellensburg DepotCorrespondTAC01Correspond
Assorted pages from missing files
Sub1-D01-06-01-12B
  
Ellensburg DepotRemodelTAC011907-011241907-0078AFE
Extend lunchroom serve more than 30 people, both employees and passengers
Sub1-D01-06-01-12B
  
Ellensburg DepotRearrange trackTAC011910-003811910-0034AFE
Rearrange track for new station
Sub1-D01-06-01-12B
  
Ellensburg DepotMove buildingTAC011910-012871910-0069AFE
Move old station / convert for use as a freight house
Sub1-D01-06-01-12B
  
Ellensburg DepotPavementTAC011912-005971912-0100AFE
Brick paving of driveway and space behind the depot
Sub1-D01-06-01-12B
  
Ellensburg DepotGradingTAC011912-007651912-0099AFE
Grading area around the station
Sub1-D01-06-01-12B
  
Ellensburg DepotDrink fountTAC011917-002811917-0009AFE
Drinking fountain in depot
Sub1-D01-06-01-12B
  
Ellensburg DepotSewer hook upTAC011917-025501917-0101AFE
Connect depot to city sewer line
Sub1-D01-06-01-12B
  
Ellensburg DepotStand pipeTAC011928-004931928-0146AFE
New stand pipe near depot
Sub1-D01-06-01-12B
  
Ellensburg Extra Blgs, Yard, SpursIce houseTAC011903-002371903-0136AFE
New 1000 ton ice house and adjustment to track
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursExtd trackTAC011905-001011905-0008AFE
Extend yard track 3970'
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursExtra tracksTAC011905-004131905-0085AFE
Combined improvements: add switch tracks (2770' & 1370') plus leads to roundhouse and coal dock
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursIce houseTAC011905-005071905-0096AFE
Additional 1000 ton ice unit plus 100' extension to the warehouse track
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursCmrl spurTAC011906-003861906-0087AFE
1107' spur to service Ellensburg Ice & Cold Storage
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursCmrl spurTAC011907-000491906-0174AFE
600' spur for Kleinburg Bros (see 777-'10 for file)
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursExtra tracksTAC011907-004501907-0094AFE
Rearrange and extend yard tracks westward (12,500' of track involved)
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursCmrl spurTAC011907-005411907-0012AFE
670' spur for St Louis Brewing and Malting CANCELED see '08-125 below
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursScaleTAC011907-006071907-0062AFE
125 ton scale at west end and new crossover at east end
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursStock yardTAC011907-011801907-0093AFE
Renewed 242' by 86' (live)stock yard fo
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursCmrl spurTAC011908-001251908-0035AFE
Work under '07-541 discontinued when fire distroyed brewery, completed here
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursStock scalesTAC011910-003351910-0018AFE
Scales to weigh stock (for sales purposes) as received into stoack yard
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursExtd spurTAC011910-007771910-0098AFE
150' extention of Kleinburg spur to service Ramsey Bros whse (includes 49-'07)
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursCmrl spurTAC011911-007691911-0092AFE
1806' spur for Washington Woolen Mill Co.
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursPlatformTAC011912-024281912-0216AFE
13' 6" h by 6' w platform along the length of the two ice houses (north side of tracks)
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursIce house spurTAC011912-024611912-0229AFE
(Aprox) 1050' of track to service 3800 ton ice house on south side of tracks
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursExtd spurTAC011912-024981912-0192AFE
300' extension of "city track" to service Crab Creek Lumber Co.
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursAir supplyTAC011913-004741913-0527AFE
Compressors, reservoirs and piping for air testing plant
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursSidewalkTAC011913-010161913-0003AFE
500' improved sidewalk crossing main tracks, as requested by city
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursCmrl spurTAC011914-003921914-0035AFE
447' spur off the Wa. Woolen Mile spur for Union Oil of So. Cal.
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursAgreementTAC011914-00392Agreement
1953 agreement to cancel 50' of leased track covered above
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursCabinetsTAC011914-010301914-0001AFE
Creating boxes surrounding air system & coach-water hydrants for safety
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursTeam trackTAC011915-004931915-0067AFE
625' general use facility
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursBunk housesTAC011915-006971915-0092AFE
Two car body bunk houses to go with 4 already on the south side of tracks
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursWater ServiceTAC011915-011771915-0063AFE
Connect N.P. facilities to city water
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursPavementTAC011915-013061915-0163AFE
Road & road bridge work to satisfy the city
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursSignal supply houseTAC011916-011391916-AFE
Move signal maintainers supply house from Thorp
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursPlatformTAC011916-011431916-0101AFE
Cut back stock yard platform to provide standard clearance
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursStock yardTAC011916-032471916-0166AFE
Add lights and drainage to all three stock yards
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursYard gongTAC011916-032701916-0178AFE
Yard telephone gong to eliminate need to send clerks to find switchmen
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursHeatingTAC011916-034341916-0215AFE
Use steam x round house to replace stoves that represent fire haz in store house
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursIce houseTAC011917-002781916-0123AFE
Install shafts and electric hoists to handle ice
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursExtd sidingsTAC011917-025211917-0102AFE
Extend siding tracks 4 & 5 by 2544' to handle 99 car consist
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursWater ServiceTAC011917-029451917-0130AFE
Water service for section gang bunk cars instead of them using nearby surface water
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursBlock signalTAC011917-030721917-0116AFE
Move east end signal so that yard loco's tripping it don't stop W bound traffic, needlessly, at Thrall
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursPlankingTAC011918-007331918-0044AFE
Use of timber instead of paving, between tracks for 5th St. crossover
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursBuildingTAC011918-020751918-0043AFE
Shelter for telegrah maintainers car and supplies. Canceled by feds
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursLockersTAC011919-027221919-0104AFE
8 Lockers for trainmen to be installed in their building which is separate from the station
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursSewer hook upTAC011920-006091920-0024AFE
Install toilet, sink and drinking fountain in yard office
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursEquipmentTAC011920-00635head engrAFE
purchase of 4 tool tie tamping machine to handle rock ballast
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursEquipmentTAC011920-00638head engrAFE
A second machine, this one charged to another account, possible transfer of assests from Seattle
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursCalculaterTAC011921-011491921-0055AFE
Purchase one (1) Daly Standard Train Resistance Computing Machine
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursElectric lightsTAC011922-007661922-0013AFE
Rewire yard office building that was originally used as a lunch counter
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursEquipmentTAC011923-012061923-2561AFE
Purchase and install cut-off saw at car repair "track" (shop?)
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursEquipmentTAC011923-014061923-2600AFE
Relocate rip saw and wet & dry grinder at car repair shop
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursSteam lineTAC011923-015241923-0102AFE
Set up system to supply steam heat to Pullman from the rd house because the Baker stoves on the cars had been removed
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursNew clockTAC011925-548 UAFE
Purchase one clock (cover sheet only for this file)
Sub1-E01-06-01-34B
  
Ellensburg Extra Blgs, Yard, SpursRemodelTAC011935-005411935-0031AFE
Recondition old round house - store house to utilize for potato washing in order to compete with the Milw RR
Sub1-E01-06-01-34B
  
Ellensburg RoundhouseRearrange trackTAC011903-002681903-0356AFE
Rearrange track to accomodate new ash pit and coal bunker
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseCoal dockTAC011903-002681903-0144AFE
Construct a four pocket arrangement
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseAsh pit TAC011903-00391AFE
Construct ash track and coal bunker to GN's standards(?)
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseLenghten stallsTAC011905-004381905-0094AFE
Lenghten the 15 engine house slots to 90'
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseTurn table / pitTAC011905-010431905-0013AFE
Replace worn 65' unit and with 85' unit
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseCinder pitTAC011912-003471912-0025AFE
Construct "depressed" cinder track to cut payroll expense
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseWheel drop pitTAC011912-005121912-0110AFE
Upgrade pit size and capacity of hydraulic lifts
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseElect TT MotorTAC011912-006691912-0140AFE
Intstall electric turntable tractor (motor) to cut payroll expense
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseFuel oil stationTAC011913-002711913-0009AFE
Construct system for handling and storing boiler fuel oil
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseElectric lightsTAC011913-006841913-0103AFE
Wiring and electric lights for roundhouse & machine shop
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseCoal dockTAC011914-026211914-0163AFE
Rebuild coal dock after fire of August 27, 5:45PM / gasoline explosion
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseRelay eng trkTAC011914-011151914-0076AFE
Replace 3rd class 56# track with 3rd class 85# to handle weight of Z-3
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseExtd oil hseTAC011914-005231914-0074AFE
10' by 20' brick extension of oil house to replace wooden strucure / concern for fire (ns)
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseWeld machineTAC011916-025771916-AFE
Oxy-acetylene machine for cutting and welding
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseO head walkTAC011916-001681916-0013AFE
Install overhead staging (catwalks) for safety of roudhouse employees
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseCinder trackTAC011917-022051917-0091AFE
Create new cinder track 600' in length - saves money & fills low spot
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseWomens rest roomTAC011918-002011918-0010AFE
Construct restroom for engine house's "female help" / lack of males caused company to hire WW1
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseSoaking vatTAC011918-003911918-0113AFE
Soaking vat for waste accumulated in oil house (bearing journal waste)
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseRemodelTAC011918-021141918-0071AFE
Reroute electric supply line for engine house & coal dock OFF of the eves of the round house / freezing steam accumulated and had cut them during winter months in the past
Sub1-D01-06-01-12B
  
Ellensburg RoundhouseEquipmentTAC011918-002251918-0105AFE
Triple valve test rack
Sub1-E01-06-01-34B
  
Ellensburg RoundhouseRelay railTAC011919-001691919-0005AFE
Replace 492' of 56# ash pit track
Sub1-E01-06-01-34B
  
Ellensburg RoundhouseDerailTAC011919-002971919-0035AFE
Relocate Hayes derail unit to level ground
Sub1-E01-06-01-34B
  
Ellensburg RoundhousePower upgradeTAC011921-005991921-0028AFE
Install tower and platform to receive 6600 volt transformer supplied by city. Upgrade power supply to facility
Sub1-E01-06-01-34B
  
Ellensburg RoundhouseRep T T motorTAC011921-007961921-0032AFE
Replace electric turn table motor after 9 years of service
Sub1-E01-06-01-34B
  
Ellensburg RoundhouseSteam lineTAC011923-015241923-0102AFE
Steam connection for emergency use to Pullman cars
Sub1-E01-06-01-34B
  
Ellensburg RoundhouseTurntable TAC011927-010371923-0065AFE
Replace 85' unit with 115' unit to handle larger engines
Sub1-E01-06-01-34B
  
Ellensburg RoundhouseRemodelTAC011929-007681929-0076AFE
Dismantle 5 stalls of old 15 stall roundhouse
Sub1-E01-06-01-34B
  
Ellensburg RoundhouseRemodelTAC011932-004221932-0001AFE
Remove turntable and machinery from the shop / table to Yakima
Sub1-E01-06-01-34B
  
Ellensburg RoundhouseRemove coal dockTAC011934Agreement
Contract for gypo's to remove coal dock, turn back steel & keep lumber
Sub1-E01-06-01-34B
  
First Sub GeneralAdd trackTAC011930-001021930-0148AFE
Relay curves Palmer Junction to Auburn 90# to 100 & 130#
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011932-0133AAFE
Relay curves Thorp to Auburn 90# to 100 & 130#
Sub-1-GNL02-09-02-56B
  
First Sub GeneralEquipmentTAC011933-00199AFE
Slide detector fencing Yakima to Ellensburg
Sub-1-GNL02-09-02-56B
  
First Sub GeneralGradingTAC011933-0234AAFE
Riprap between Hotsprings and Maywood
Sub-1-GNL02-09-02-56B
  
First Sub GeneralEquipmentTAC011934-00268AFE
Rail and flangle lubricators Ellensburg to Plamer Junction
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011936-113ASAFE
Relay rail - Roza to Kennedy
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011940-00130AFE
Relay rail 90 with 112# - Kountze to Teanaway
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011940-00132AFE
Relay curves between Hillside and Palmer Junction
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011942-00554AFE
Relay curves between Dudley and Kountze
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011944-00600AFE
Relaying curves, mostly worn 130# with same
Sub-1-GNL02-09-02-56B
  
First Sub GeneralGradingTAC011944-521ABAFE
Ballast and bank widening, Kanaskat to Auburn
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011945-00665AFE
Relaying worn 100# with 112# stock - Cle Elum to Easton
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011946-00091AFE
Relaying worn 100# with 112# stock - Bristol to Cle Elum
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011946-00092AFE
Relaying worn 100# with 112# stock - Nelson to Easton
Sub-1-GNL02-09-02-56B
  
First Sub GeneralEquipmentTAC011947-001151947-0009AFE
Slide detector fencing Hillside to Roza and Bristol to Teanaway
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011948-654ABAFE
Relaying curves, mostly worn 130# with same Yakima to Auburn
Sub-1-GNL02-09-02-56B
  
First Sub GeneralEquipmentTAC011950-00057AFE
Rail anchors - Thrall to Thorp
Sub-1-GNL02-09-02-56B
  
First Sub GeneralGradingTAC011950-00121AFE
Ballast curves Yakima to Ellensburg
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011950-00176AFE
Relay worn 100# rail with 115 & 130# stock
Sub-1-GNL02-09-02-56B
  
First Sub GeneralGradingTAC011950-00347AFE
Ballasting - Bristol to Thorp
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011950-219ABAFE
Relaying curves between Yakima and Auburn
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011951-00256AFE
Relaying worn 110# with 115# stock
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011952-190ABAFE
Relaying 90 & 100# Rail with 115# & 132# stock
Sub-1-GNL02-09-02-56B
  
First Sub GeneralAdd trackTAC011952-451ABAFE
Curve relay
Sub-1-GNL02-09-02-56B
  
First Sub GeneralENGINEER FILETAC011967-1976Correspond
YAKIMA (area) Assistant Chief Engineers file
Sub-1-GNL02-09-02-56B
  
First Sub GeneralENGINEER FILETAC011954-1969Correspond
YAKIMA (area) Assistant Chief Engineers file
Sub-1-GNL02-09-02-56B
  
First Subdivison GeneralSignalsTAC011903AFE
Discussion of block signals in system
Gen1-A01-05-03-56B
  
First Subdivison GeneralRelay railTAC011906-01030AFE
with 85#
Gen1-A01-05-03-56B
  
First Subdivison GeneralCorrepondTAC01Correspond
Weather conditions for 1930
Gen1-B01-05-04-56A
  
HaybowScaleTAC011930-011681930-0105AFE
Replace small 10 ton truck scale with 20 ton / 9'x20' Fairbanks Morse
Sub1-E01-06-01-34B
  
HaybowCorrespondTAC01Correspond
Hand written complaint regarding drainage
Sub1-E01-06-01-34B
  
HeadworksGradingTac011938-00427AFE
Riprap Various Locations
Sub-1-102-09-03-12B
  
Henry's SwitchAgreementTAC011903Agreement
between NWI, NPRY, and Pacific Coast Coal: creation of "Henrys"
Sub1-M01-06-03-12A
  
Henry's SwitchRaise P trackTAC011923-009051923-0087AFE
Raise level of 5685' of two sets of passing tracks 12" to par with main line using cinders from Lester
Sub1-M01-06-03-12A
  
Henry's SwitchCulvertTAC011918-024631918-0085AFE
Reinforced concrete culvert
Sub1-M01-06-03-12A
  
Henry's SwitchCmrl spurTAC011918-024381918-0073AFE
320' spur for Neukirchen Bros.saw mill on Lake Sawyer
Sub1-M01-06-03-12A
  
HillsideAdd trackTac011938-00207AFE
Layout tracks in connection with the Dept. of Interior's Roza Dam Project
Sub-1-102-09-03-12B
  
Hillside - RozaRemove signalTAC011918-24891918-0110AFE
Remove tonnage signal
Gen1-A01-05-03-56B
  
HolmesAdd trackTac011948-006861948-0113AFE
Move east turnoutof the old (U&I) sugar co. track east to extend the Holmes log track spur
Sub-1-102-09-03-12B
  
Hot SpringsChannelTAC011903-003001903-0268AFE
Deepen the bed od Champion creek (correspondence with land owner included)
Sub1-J01-06-02-12B
  
Hot SpringsExtd spurTAC011910-001401910-0010AFE
150' tail extension to Kloeber spur for Morgan Lbr Co.
Sub1-J01-06-02-12B
  
Hot SpringsBridge TAC011914-021771914-0071AFE
Replace pile structure with through plate girder span on concrete abutments
Sub1-J01-06-02-12B
  
Hot SpringsCmrl spurTAC011915-003441915-0043AFE
Remove 644' Morgan Lbr spur and lay 540' spur for Hot Springs Wood and Post
Sub1-J01-06-02-12B
  
Hot SpringsKey spurTAC011915-004831915-0016AFE
500' spur off main line (above lead "tails" off this)
Sub1-J01-06-02-12B
  
Hot SpringsExtn spurTAC011917-001581917-0019AFE
32' extension to Hot Springs Wood and Post spur
Sub1-J01-06-02-12B
  
Hot SpringsTelephoneTAC011917-007741917-0053AFE
Accounting for telephone booth that was actually placed 3 years earlier
Sub1-J01-06-02-12B
  
Hot SpringsChannelTAC011918-004201918-0016AFE
250' long ditch to divert run off away for ROW into Rock Creek
Sub1-J01-06-02-12B
  
Hot SpringsRemove depotTAC011923-005471923-0039AFE
Remove remains of depot distroyed by fire in 1922
Sub1-J01-06-02-12B
  
Hot SpringsRemove spursTAC011925-001201924-0186AFE
Remove 1394' house spur and lead, and 461' stock yard spur
Sub1-J01-06-02-12B
  
Hot SpringsRemove stk ydTAC011926-000491925-0213AFE
Remove stock yard
Sub1-J01-06-02-12B
  
Hot SpringsCmrl spurTAC011936-002961936-0011AFE
Rearrange 287' spur and add 327' for North Pacific Timber
Sub1-J01-06-02-12B
  
Hot Springs - HumphreyRelay railTAC011915-010961915-0037AFE
Replace 85# with 90#
Gen1-B01-05-04-56A
  
Hot Springs - Palmer JctBallastingTAC011913-011891913-0056AFE
Gen1-B01-05-04-56A
  
HubnerCorrespondTAC011911-0001A1911-000ACorrespond
Hubner being recognized as name for spur
Sub1-H01-06-02-34A
  
HumphreyExtd P trackTAC011913-004091913-0025AFE
992' extensions to both passing tracks plus move water tower
Sub1-K01-06-02-34B
  
HumphreyCmrl spurTAC011914-002941914-0037AFE
779' spur to service Ellis and Creech
Sub1-K01-06-02-34B
  
HumphreyRelay railTAC011914-007091914-0072AFE
Track used for spur above relayed to quarry spur
Sub1-K01-06-02-34B
  
HumphreyRemove quarry spurTAC011917-030291917-0136AFE
Remove 2144' quarry, outfit car and derrick spur tracks
Sub1-K01-06-02-34B
  
HumphreyCulvertTAC011921-005231921-0000AFE
Replace 56' of 24" vitrified pipe with reinforced concrete pipe
Sub1-K01-06-02-34B
  
HumphreyRemove spurTAC011923-070011923-0008AFE
Remove quarry spur that was constructed in 1918, AFE 1091
Sub1-K01-06-02-34B
  
HumphreyExtd spurTAC011936-005821936-0067AFE
380' extension spur serving Barker - Knapp
Sub1-K01-06-02-34B
  
Humphrey - LemoloRelay railTAC011916-012711916-0186AFE
Replace 85# with 90#
Gen1-B01-05-04-56A
  
Humphrey - Palmer JctRail anchorsTAC011915-005011915-0053AFE
Gen1-B01-05-04-56A
  
Humphrey (Canton)Extd P trackTAC011901-003111901-0034AFE
192' extension to the passing track
Sub1-K01-06-02-34B
  
Humphrey (Canton)New DepotTAC011906-003061906-0009AFE
Errect 4th class depot (info to the effect that Canton could have been this depots name)
Sub1-K01-06-02-34B
  
Humphrey (Canton)Set out trackTAC011907-006051907-0072AFE
800' set out track for bad order equipment
Sub1-K01-06-02-34B
  
Humphrey (Canton)Extd P trackTAC011907-006701907-0043AFE
Extend old passing track and add a 3200' new ps track
Sub1-K01-06-02-34B
  
Humphrey (Canton)Quarry spurTAC011908-003321908-0095AFE
2144' temporary quarry, outfit car and derrick spur tracks
Sub1-K01-06-02-34B
  
IndioPassing trackTAC011912-006111912-0057AFE
Extend 951'
Gen1-A01-05-03-56B
  
IndioSet out trackTAC011913-006171913-0033AFE
225' set out track
Gen1-A01-05-03-56B
  
Indio - Canyon Relay railTAC011911-010971911-0038AFE
90# MP 118 - 113
Gen1-A01-05-03-56B
  
Indio - EllensburgRelay railTAC011923-004731923-0019AFE
90# 7.84 miles
Gen1-A01-05-03-56B
  
KanaskatPassing trackTAC011903-002381903-0137AFE
395' passing track
Sub1-L01-06-02-56B
  
KanaskatRemodelTAC011906-011151906-0081AFE
12' extension to depot
Sub1-L01-06-02-56B
  
KanaskatWye TAC011907-004881907-0035AFE
410' connection of wye with passing track, plus 450' extension to storage track
Sub1-L01-06-02-56B
  
KanaskatCoal trackTAC011908-003331908-0092AFE
290' coal spur to allow coaling of engines during the night
Sub1-L01-06-02-56B
  
KanaskatRelay railTAC011912-015441912-0200AFE
Replace exising 56 & 60# rail in wye with 85#
Sub1-L01-06-02-56B
  
KanaskatWater tankTAC011912-020011912-0145AFE
Replace 48,000 gal wood water tank with 100,000 gal steel tank & associated improvements
Sub1-L01-06-02-56B
  
KanaskatExtd P trackTAC011912-023221912-0067AFE
1,123' extension to W bound passing track
Sub1-L01-06-02-56B
  
KanaskatExtd P trackTAC011913-000911913-0013AFE
774' extension of E bound passing track
Sub1-L01-06-02-56B
  
KanaskatStorage trackTAC011913-004811913-0049AFE
Additional track for storage of GR branch traffic and not block passing track
Sub1-L01-06-02-56B
  
KanaskatScale TAC011914-004661914-0050AFE
Install scale on siding between Kanasket and Palmer Junction
Sub1-L01-06-02-56B
  
KanaskatUmbrella shedTAC011915-006101914-0168AFE
560' umbrella shed to protect waiting passengers generated off the Buckley Branch
Sub1-L01-06-02-56B
  
KanaskatTrain order signalTAC011915-022111915-0126AFE
Install an upper quadrant, three position train order signal
Sub1-L01-06-02-56B
  
KanaskatRemodelTAC011916-033491916-0191AFE
Widen the depots bay window to allow spacing between operator and order signal levers
Sub1-L01-06-02-56B
  
KanaskatElectric lightsTAC011917-003691917-0027AFE
Connect depot with Puget Sound Light and Power to remove fire hazard
Sub1-L01-06-02-56B
  
KanaskatWater fountTAC011917-010461917-0032AFE
Install drinking fountain for passengers
Sub1-L01-06-02-56B
  
KanaskatPlatformTAC011919-001481918-0117AFE
80' extension to transfer platorm
Sub1-L01-06-02-56B
  
KanaskatEquipmentTAC011919-020681919-0051AFE
Portable gravity baggage conveyor
Sub1-L01-06-02-56B
  
KanaskatSwitch TAC011919-022601919-0068AFE
Lamps for the switches in the yard
Sub1-L01-06-02-56B
  
KanaskatExtd spurTAC011919-024901919-0085AFE
Extend auto spur to store engines and allow cinder dumping
Sub1-L01-06-02-56B
  
KanaskatSection houseTAC011920-012171920-0158AFE
Bunk and section houses for Green River Branch
Sub1-L01-06-02-56B
  
KanaskatExtd spurTAC011920-014531920-0050AFE
Open second end of "auto" track with a 288' extension
Sub1-L01-06-02-56B
  
KanaskatTest boresTAC011921-070301921-0108AFE
Drilling test holes to asess gravel deposite (file attached behind AFE 7029)
Sub1-L01-06-02-56B
  
KanaskatGravel spurTAC011922-070291922-0111AFE
5,678' track to access new gravel pit
Sub1-L01-06-02-56B
  
KanaskatRemodelTAC011925-000061925-0152AFE
Repair and resize umbrella shed to 126' in length
Sub1-L01-06-02-56B
  
KanaskatOutfit car trackTAC011927-004021927-0027AFE
Outfit car track
Sub1-L01-06-02-56B
  
KanaskatScaleTAC011927-005841927-0055AFE
Replace wood weight bridge unit with steel unit
Sub1-L01-06-02-56B
  
KanaskatAdd trackTac011934-00193AFE
Relay a portion of curve #84
Sub-1-102-09-03-12B
  
KanaskatGradingTac01AFE
Riprap canceled
Sub-1-102-09-03-12B
  
Kanasket - AuburnRelay railTAC011923-013531923-0170AFE
Upgrade material used at curved sections to 100# & 130# stock
Gen1-B01-05-04-56A
  
Kanasket - CovingtonBank wideningTAC011917-012771916-0199AFE
and reballasting
Gen1-B01-05-04-56A
  
KennedyCulvertTAC011916-026921916-00124AFE
Replace 24' of a 18" tile pipe with 19" Galvo - Iron pipe Culvert #189-A
Sub1-I01-06-02-56A
  
KennedyToiletsTAC011915-010851915-0032AFE
Sanitary toilets (pit model)
Sub1-I01-06-02-56A
  
KennedyRemodelTAC011916-001241916-0023AFE
10' x 10' lean to additional to box car body residence
Sub1-I01-06-02-56A
  
KountzePassing trackTAC011906-000701907-0024AFE
3331' passing track approved 06 / cost adjusted 07
Sub1-F01-06-01-56B
  
KountzeExtd P trackTAC011912-007721912-0072AFE
680' extension to E bound passing track to handle 70-75 car consists
Sub1-F01-06-01-56B
  
KountzeCmrl spurTAC011913-006641913-0062AFE
960' spur to handle Cascade Lumber
Sub1-F01-06-01-56B
  
KountzeExtd spurTAC011914-028191914-0187AFE
500' extension to Cascade Lumber spur
Sub1-F01-06-01-56B
  
KountzeCulvert TAC011917-021561917-0081AFE
Additional culvert instead of larger one
Sub1-F01-06-01-56B
  
KountzeRemove spurTAC011917-031241917-0123AFE
Remove only 400' / allowing 800' to remain
Sub1-F01-06-01-56B
  
LemoloPassing trackTAC011904-001591904-0008AFE
3,000' passing track
Sub1-K01-06-02-34B
  
LemoloExtd P trackTAC011912-007281912-0071AFE
1361' Extension to the W bound passing track
Sub1-K01-06-02-34B
  
LemoloCulvertTAC011921-005211921-0004AFE
Replace wood box culvert with 36" concrete pipe
Sub1-K01-06-02-34B
  
LemoloCulvertTAC011921-005221921-0003AFE
Replace wood box culvert with 36" concrete pipe
Sub1-K01-06-02-34B
  
LemoloEquipmentTac011933-00199AFE
Slide detector fencing
Sub-1-102-09-03-12B
  
Lemolo - HumphreyRail anchorsTAC011914-002101914-0029AFE
Gen1-B01-05-04-56A
  
Lemolo - Palmer JctRelay railTAC011916-010381916-0017AFE
Replace 85# with 90#
Gen1-B01-05-04-56A
  
LesterEquipmentTac011949-006841949-ED94AFE
Install four electric (near depot) and one gas (west from) switch heaters
Sub-1-102-09-03-12B
  
LesterAdd trackTAC011929-00504AFE
Relay 100#
Sub-1-102-09-03-12B
  
LesterRemove trackTAC011930-006401930-0048AFE
Remove portion of fuel oil station spur
Sub-1-102-09-03-12B
  
LesterAdd trackTAC011949-000421948-0167AFE
Trackage to serve Soundview Pulp Co.
Sub-1-102-09-03-12B
  
LesterBuildingTAC011956-00048AFE
Fire protection
Sub-1-102-09-03-12B
  
Lester - KennedyMOW workTAC011924AFE
Emergency repairs to banks
Gen1-B01-05-04-56A
  
Lester - Palmer Jct.Relay railTAC011913-010841913-0035AFE
Replace "turnouts" with 85# rail
Gen1-B01-05-04-56A
  
Lester - Palmer Jct.Telegraph TAC011914-007521914-0010AFE
Line supports (steel) on 4 bridges
Gen1-B01-05-04-56A
  
Lester - Palmer Jct.RiprapTAC011918-006721918-0037AFE
Gen1-B01-05-04-56A
  
Lester - Palmer Jct.RiprapTAC011922-00537AFE
Gen1-B01-05-04-56A
  
Lester DepotWater SupplyTAC011906-004161906-0086AFE
5.800' of wooden gravity feed pipe line from hill
Sub1-J01-06-02-12B
  
Lester DepotRemodelTAC011906-0020AFE
Incomplete file, but contains a diagram for a 30'' extension to the existing 28' wide section house
Sub1-J01-06-02-12B
  
Lester DepotRemodelTAC011911-000611911-0011AFE
Extend engineer's room to provide a bath room
Sub1-J01-06-02-12B
  
Lester DepotCaboose trackTAC011914-007111914-0078AFE
320' track expressly for storing a caboose
Sub1-J01-06-02-12B
  
Lester DepotRemodelTAC011922-002331922-0030AFE
Install indoor plumbing in roadmasters house (Second RFA)
Sub1-J01-06-02-12B
  
Lester DepotSteam heatTAC011928-006431928-0014AFE
Steam heat in depot
Sub1-J01-06-02-12B
  
Lester DepotElectric lightsTAC011929-008191929-0086AFE
Large file concerning putting NP's facilities in Lester on Puget Powers grid
Sub1-J01-06-02-12B
  
Lester RoundhouseTurntableTAC011905-010441905-0014AFE
85' turn table to replace existing 65' model to handle loco's larger than 10 wheelers
Sub1-J01-06-02-12B
  
Lester RoundhouseRearrange trackTAC011910-000701910-0004AFE
Reset track to align with new coal dock
Sub1-J01-06-02-12B
  
Lester RoundhouseBuildingTAC011911-007801911-0101AFE
Errect a 20' x 40' machine shop
Sub1-J01-06-02-12B
  
Lester RoundhouseBuildingTAC011912-006611912-0041AFE
Remove and replace old roundhouse with structure large enough to handle "Mikes"
Sub1-J01-06-02-12B
  
Lester RoundhouseRearrange trackTAC011915-006651915-0045AFE
Reset track gravel pit access track
Sub1-J01-06-02-12B
  
Lester RoundhouseReplace drainsTAC011915-020171915-0111AFE
Replace roundhouse and turntable's wood pipe drains with vitrified pipe
Sub1-J01-06-02-12B
  
Lester RoundhouseCinder pitTAC011920-013871920-0000AFE
Repair cinder pit (not a full file)
Sub1-J01-06-02-12B
  
MartinCorrespondTAC01Correspond
about the Mountaineers building a lodge 1922 - 1939
Sub1-H01-06-02-34A
  
MartinBuildingTAC011904-012101904-0091AFE
Section house, bunk house and tool shed
Sub1-H01-06-02-34A
  
MartinExtd P trackTAC011906-001231906-0054AFE
Extend southside passing track 378' for total of 3369' & n-side by 3188 for a total of 4871'
Sub1-H01-06-02-34A
  
MartinRemodelTAC011913-001251913-0010AFE
Additions to telegraph offices at Martin and Sampede for tunnel rescue gear
Sub1-H01-06-02-34A
  
MartinT O signalTAC011914-014471914-0179AFE
Install "Swift" train order signal
Sub1-H01-06-02-34A
  
MartinMove officeTAC011914-025861914-0155AFE
Move telegraph office to tunnel portal to avoid having train crews do switch throwing
Sub1-H01-06-02-34A
  
MartinRelay railTAC011914-014331914-0175AFE
Replace lighter weight rail with 85# stock on W bound passing track
Sub1-H01-06-02-34A
  
MartinTelegraph TAC011916-02722AFE
Rebuild telegraph line cutting overland above the tunnel
Sub1-H01-06-02-34A
  
MartinRemodelTAC011916-034511916-0204AFE
Disconnect and move living quarters away from the tunnel portal, and expand them
Sub1-H01-06-02-34A
  
MartinWater supplyTAC011917-025761917-0106AFE
Move water intake box further up hillside to increase flow and add service to the residences
Sub1-H01-06-02-34A
  
MartinBuildingTAC011920-012151920-0041AFE
17' addition to the section bunk house and plumb for water
Sub1-H01-06-02-34A
  
MartinBridgeTAC011923-002881923-MFCAFE
Repair / upgrade strength of Bridge #46
Sub1-H01-06-02-34A
  
MartinWater tankTAC011925-014831925-0149AFE
Replace 7,700 gallon water tank that was installed in 1909
Sub1-H01-06-02-34A
  
MartinCoal shedTAC011926-011801926-0103AFE
Replace 7' x 10' coal/oil shed with 9' x 20' unit so supplies will hold up in winter
Sub1-H01-06-02-34A
  
MartinWater supplyTAC011929-013601929-0119AFE
Improve water supply to the section house by co-op effort with Mountaineers
Sub1-H01-06-02-34A
  
MartinBuildingTAC011957-0182AAFE
Tunnel #3 renew timber covers and drain
Sub-1-102-09-03-12B
  
MartinEquipmentTAC011949-00581AFE
Gas switch heater here
Sub-1-102-09-03-12B
  
MaywoodExtd P trackTAC011901-003101901-0033AFE
205' extension to passing track
Sub1-K01-06-02-34B
  
MaywoodCmrl spurTAC011911-003711911-0008AFE
4127' of track for Morgan Lbr to create muliple spurs
Sub1-K01-06-02-34B
  
MaywoodExtd P trackTAC011912-006401912-0065AFE
1202' extension to the E bound passing track (4,000'+ total)
Sub1-K01-06-02-34B
  
MaywoodExtd P trackTAC011913-002701913-0026AFE
981' extension to the W bound passing track (4,000' total)
Sub1-K01-06-02-34B
  
MaywoodSection houseTAC011913-023901913-0142AFE
Rebuild section house destroyed by chimney fire on July 19
Sub1-K01-06-02-34B
  
MaywoodRemove depotTAC011916-033921916-0193AFE
Official write off of depot (section house?) destroyed by fire
Sub1-K01-06-02-34B
  
MaywoodExtd team trackTAC011917-001591917-0022AFE
323' extension of team track laid in 1911 is offically herein accounted for
Sub1-K01-06-02-34B
  
MaywoodCmrl spurTAC011925-013651925-0134AFE
Twin leads to spur track of the Scott & Howe Timber Co.
Sub1-K01-06-02-34B
  
MaywoodRemove spursTAC011930-012061930-0115AFE
Remove dual lead tracks to Forbes Timber Co. operations aka - Forcamp
Sub1-K01-06-02-34B
  
Maywood - BaldiBank wideningTAC011927-001121926-0183AFE
Gen1-B01-05-04-56A
  
Maywood - KanasketRelay railTAC011923-013241923-0169AFE
Upgrade material used at curved sections to 100# & 130# stock
Gen1-B01-05-04-56A
  
MP 119Gravel pitTAC011908-003941908-0039AFE
Upgrade 749' emergency rock spur for future use
Gen1-A01-05-03-56B
  
NagromCmrl spurTAC011917-001571917-0012AFE
Existing turn out for Morgan Lbr offically accounted for
Sub1-K01-06-02-34B
  
NelsonRelay railTAC011916-011551916-0102AFE
Relay short sections of passing track (56# & 60# rial with 85#) Change to Nelson on 8-10-15
Sub1-G01-06-02-12A
  
NelsonNew depotTAC011920-015081920-0072AFE
Replace depot and coal shed destroyed earlier in year by fire
Sub1-G01-06-02-12A
  
NelsonRearrange trackTAC011927-008321927-0078AFE
Remove 4008' of passing trk (N of main line). Extend WB passing trk (S. of main line)
Sub1-G01-06-02-12A
  
NelsonEquipmentTAC011957-00342AFE
Install the compressor for a snow blower
Sub-1-102-09-03-12B
  
Nelson - EastonPassing trackTAC011906-00072AFE
Gen1-B01-05-04-56A
  
Nelson - KanasketBallastingTAC011921-007081921-0076AFE
& bank widening
Gen1-B01-05-04-56A
  
Nelson(s)Section houseTAC011907-004891907-0022AFE
Construct facilities for section foreman's family, bunk house for crews, storage for supplies
Sub1-G01-06-02-12A
  
Nelson'sRelay railTAC011911-012141911-0043AFE
Relay short sections of passing track
Sub1-G01-06-02-12A
  
Nelson'sExtd P trackTAC011912-001771912-0031AFE
1182' extension to EB passing track
Sub1-G01-06-02-12A
  
Nelson'sExtd P trackTAC011913-003761913-0053AFE
979' extension to WB passing track
Sub1-G01-06-02-12A
  
Nelson'sROW FencingTAC011913-024441913-0159AFE
6,000' of fence to protect Bart Bruno's cattle
Sub1-G01-06-02-12A
  
North YakimaCmrl spurTAC011906-004471906-0033AFE
CB Brussell's Canning site
Sub1-A01-06-01-12A
  
North YakimaCmrl spurTAC011907-0043AFE
Cascade Lumber Co. Seems to not have become an AFE, But accomplished regardless
Sub1-A01-06-01-12A
  
North YakimaExtd spurTAC011906-010341906-0005AFE
Extend Lombard & Horsley Spur for benefit of Garrett Bros. Brick
Sub1-A01-06-01-12A
  
North YakimaCmrl spurTAC011907-00336AFE
Spokane Gas
Sub1-A01-06-01-12A
  
North YakimaExtd spurTAC011908-010251908-0002AFE
62' extension to spur to serve Yakima Rex Spray Co.
Sub1-A01-06-01-12A
  
North YakimaCmrl spurTAC011909-005151909-0052AFE
Consolidated Fuel
Sub1-B01-06-01-34A
  
North YakimaCmrl spurTAC011910-007121910-0122AFE
Independent Paving CANCELED
Sub1-B01-06-01-34A
  
North YakimaExtd spurTAC011911-000731919-0133AFE
Rearrangement and extension of St. Paul & Tacoma Lbr track
Sub1-B01-06-01-34A
  
North YakimaCmrl spurTAC011911-00413AFE
ENVELOP ONLY Northland ManufacturingCo.
Sub1-B01-06-01-34A
  
North YakimaCmrl spurTAC011911-004741911-0062AFE
Yakima Co. rock quarry
Sub1-B01-06-01-34A
  
North YakimaCmrl spurTAC011911-005311911-0050AFE
Expansion of RFA 1910-122 for Warren Construction
Sub1-B01-06-01-34A
  
North YakimaExtd spurTAC011912-023741912-0165AFE
84' extension to Rex Spray Co. spur for Wa. Refining Co.
Sub1-B01-06-01-34A
  
North YakimaCmrl spurTAC011913-003411013-0169AFE
Pacific Power & Light
Sub1-B01-06-01-34A
  
North YakimaSidewalkTAC011914-0088AFE
Costs of these walkways assigned to the customers -Pacific P&L & Yakima Co.
Sub1-B01-06-01-34A